| Detailed Construction by Sections as defined in Van's
Builders Manual:
Emp Unpacking
Section 6 VS
Section 7 Rudder
Section 8 HS
Section 9 Elevators
Section 10 Tailcone
Section 11 Emp Attach
Section 12 Emp Fairings
Wings Unpacking
Section 13 Main Spar
Section 14 Wing Ribs
Section 15 Rear Spar
Section 16 Top Skins
Section 17 Outboard LE
Section 18 Fuel Tank
Section 19 Stall Warning
Section 20 Bottom Skins
Section 21 Aileron
Section 22 Flap
Section 23 Aileron Actuation
Section 24 Wing Tip Installation
Fuselage, Finish Unpacking
Fuselage Kit
Section 25 Mid Fuse Bulkheads
Section 26 Mid F. Ribs B. Skins
Section 27 Firewall
Section 28 Fwd Fuse Ribs Bulk
Section 29 Fuse Side Skins
Section 30 Step Installation
Section 31 U. Forward Fuselage
Section 32 Tail Cone Attach
Section 33 Baggage Area
Section 34 Baggage Door
Section 35 Access & Floors
Section 36 Brake Lines
Section 37 Fuel System
Section 38 R. Pedals & Br Syst
Section 39 Control System
Section 40 Flap System
Section 41 Instrument Panel
Section 42 Rear Seat Backs
Section 43 Cabin
Section 44 Wing Attachment
Finishing Kit
Section 45 Cabin Doors &
Transparencies
Section -- Interior
Section -- Door Latch Warning
Section 46 Engine Mnt & Gear
Section 47 Spinner & Cowling
Section 48 Gear, Wheel Fairings
Section 49 Seats
Section 50 Cabin Heat
Firewall Forward
Section FF1 Engine Installation
Section FF2 Cowl Baffle
Section FF3 Control Cables
Section FF4 Fuel System
Section FF5 Oil System
|
| This site contains a pictorial and
word description of the construction of 410GB. Much thanks
must go to Tim Olson, Vic
Syracuse and all the other great members of the VansairForce
and Matronics
RV-10 Forums. |
|
|
| The Empennage/Tailcone Kit and Wing Kit
were ordered Dec 12, 2006. The Empennage Kit was delivered Dec
27, 2006 and the Wing Kit was delivered February 14 2007. The Emp kit was complete through Section 11 Empennage Attachment
on Feb 11 and part of Section 12 Emp Fairings was completed on Feb
16 when all work was shifted to the Wings. When work was
shifted, 242 hours of direct work had been logged working on the
Empennage.
The Wing Kit took approximately 342 hours to complete excluding
wiring.
The Fuselage and Finishing Kit was ordered July 2, 2007, shipped
August 28th and picket up at the FedEx Freight terminal on August
31st.. As of Christmas approximately 204 hours work has been
performed and the Fuselage is complete through Section 31 + 36 and
most of 37.
|
|
Tools Used and the
Work Area
Weights & Measures |
| Site last updated 12/27/07 |
This site will always be under construction just like
N410GB. The site is provided for the enjoyment and education of
other potential and current RV-10 builders. This site is intended to
be functional, it is NOT intended to look pretty. Any extra time
goes into building, not web design.
Construction Log for the Van's Aircraft RV-10
# 40674 with reserved # N410GB
|
|